Shoulder Seasons: Why They Win
4 reasons April-May + September-October dominate:
- Contractor availability: not maxed by emergency repair work
- Lead time: 2-4 weeks vs 6-8 weeks in peak season
- Crew productivity: 60-75°F ideal vs 90°F summer or sub-30°F winter
- Mass Save processing: faster off-peak; rebate arrives in 6 weeks vs 10+ in peak
Frequently Asked Questions
Can I install a heat pump in winter if needed?
What if my furnace dies in summer?
References & Sources
- Mass Save heat pump rebate program. https://www.masssave.com/saving/residential-rebates/heat-pumps



